Electric fleet

EVs that make the morning gate on time.

Electric cabs and buses for corporate commute in Hyderabad — scheduled against charge readiness so sustainability stays operational.

Electric cab charging before the morning roster

See a planning number for your headcount

Electric trip-legs / day
336
Indicative CO₂ avoided / day
0.6 t

A planning estimate for discussion: about 1.7 kg CO₂ per replaced petrol-cab kilometre-equivalent on a 12 km Hyderabad hop. Your mix and idle time will refine the number.

Charged before rostered

A car re-enters the morning board only when pack, papers, and a spare plan are ready.

Depot-led planning

We plan dwell against Hyderabad hop lengths. Mid-day charge is a scheduled part of the roster.

Named backup cover

If a pack fails, a swap vehicle is already on the desk — so riders are not left waiting for a recovery plan.

Broader commitments on drivers and the environment sit on ESG. This page covers the operations mix — charge planning, depot dwell, and backup cover.

Start with one campus loop.

We expand EV cover route by route so reliability stays intact — then scale from a loop that already works.

Pick a loop